(08) 7082 3023
2/53 Galway Ave, Marleston SA

HDPE Gas Mains Replacement - Wayville

Wayville
2.5
KM covered
11
Weeks
15
Years Experience
Project Description
Our team provided true turn-key design and construct, with design completed by Metro Utilities.

The aim of the project was the renewal of the gas mains going into the Wayville Showgrounds, located on the city fringes. The work on this high pressure network involved service splitting and insertion, and required us to undertake open cut trenching. There were a number of challenges involved in the project, most notably having to manage the work on the busy main roads around the Showgrounds, yet these were managed successfully so that the work was completed on time and on budget.

CONTACT US
100
KM covered
11
Weeks
15
Years Experience
APA Management

Pass on my thanks and appreciation to the Diona and Metro Utilities teams involved in mains replacement work at Fulham Gardens

n accordance with APA procedures, and particularly the Concrete Cutting Prior to Excavation Flowchart process, the Metro Utilities crew made a decision to isolate gas supply prior to cutting concrete due to concerns over a possible shallow service within a Multi User site based on readings from the locator. In accordance with APA procedures, and particularly the Concrete Cutting Prior to Excavation Flowchart process, the Metro Utilities crew made a decision to isolate gas supply prior to cutting concrete due to concerns over a possible shallow service within a Multi User site based on readings from the locator.

 

Following cutting and removal of the concrete multiple instances of shallow gas services were found within the unit site and the concut blade did actually contact the isolated gas service at Unit 6. The proactive actions of the crew to isolate gas supply prior to cutting the concrete prevented this becoming a Level 3 asset strike and exposing the workers to a hazardous situation. It also reinforces our belief that every asset strike is preventable.

Browse Projects