13
KM covered
39
Weeks
15
Years combined experience
Project Description
Our team provided true turn-key design and construct, with design completed by Metro Utilities.

The primary aim of this project was the replacement of the existing low pressure gas mains. This required large diameter gas main insertion work and involved inserting new polyethylene pipes through the existing cast iron gas mains. The project demanded detailed planning and project management, as extensive night works were required on busy suburban roads, including Henley Beach Road and Tapleys Hill Road.

CONTACT US
13
KM covered
39
Weeks
15
Years combined experience
APA Management

Pass on my thanks and appreciation to the Diona and Metro Utilities teams involved in mains replacement work at Fulham Gardens

n accordance with APA procedures, and particularly the Concrete Cutting Prior to Excavation Flowchart process, the Metro Utilities crew made a decision to isolate gas supply prior to cutting concrete due to concerns over a possible shallow service within a Multi User site based on readings from the locator. In accordance with APA procedures, and particularly the Concrete Cutting Prior to Excavation Flowchart process, the Metro Utilities crew made a decision to isolate gas supply prior to cutting concrete due to concerns over a possible shallow service within a Multi User site based on readings from the locator.

 

Following cutting and removal of the concrete multiple instances of shallow gas services were found within the unit site and the concut blade did actually contact the isolated gas service at Unit 6. The proactive actions of the crew to isolate gas supply prior to cutting the concrete prevented this becoming a Level 3 asset strike and exposing the workers to a hazardous situation. It also reinforces our belief that every asset strike is preventable.